Rehabilitation with BRAWOLINER® HT on the Champs- Élysées
Construction of the "Grand Palais des Beaux-Arts" on the Champs-Élysées started in Paris in 1897 for…
# #
Bevor the installation, the flexible BRAWOLINER® will be impregnated with epoxy resin and then inserted in the defective pipe by using air or water pressure. BRAWOLINER® lines the pipe completely and eliminates all existing and potential damages. The result is a completely new and dense tube in the old pipe with significantly better static properties.
The rehabilitation of waste water pipes in buildings is subject to special requirements and strict structural rules. The BRAWOLINER® HT rehabilitation system meets all structural requirements and has moreover the exacting DIBt approval for the rehabilitation of waste water pipes within buildings.
Construction of the "Grand Palais des Beaux-Arts" on the Champs-Élysées started in Paris in 1897 for…
The system provider BRAWO® SYSTEMS has successfully completed the test programme specified by the…
A 52-metre-high apartment building was completely rehabilitated by Bouygues Batiment and made fit…
From January 24 to 27, 2024, the WWETT in Indianapolis, USA, will open its doors again and we will…